FULL RESEARCH GUIDE / PUBLIC PROCUREMENT

Energy, Infrastructure and Transport Procurement in Norway

Energy, infrastructure and transport procurement: buyers, processes and opportunities.

4,380 words·21 min read·Norge project

The complete recovered report. Published without shortening. Original citation links are incomplete; nonfunctional research markers are omitted from this reading view. The unedited document is available to download.

Introduction – why Norway’s procurement landscape matters

Norway’s public procurement market exceeds NOK 600–650 billion annually, making it one of Europe’s largest procurement markets relative to population. Procurement is decentralised across ministries, agencies, state enterprises and more than 350 municipalities, but the rules derive from the Public Procurement Act (LOA) and EU/EEA directives. Contracts above national thresholds must be published on Doffin, Norway’s national tender portal, and larger contracts are also published on the EU’s TED platform. The Public Procurement Act enforces core principles of equal treatment, non‑discrimination, transparency and proportionality. With the government accelerating the green transition, electrification, and defence modernisation, energy, infrastructure and transport projects attract domestic and foreign suppliers. Understanding how Norway buys – from electricity grids to highways, ports, railways and defence‑adjacent facilities – is crucial for suppliers seeking to enter or expand in this market.

This report synthesises public sources, official guidelines and legal reforms to provide a deep analysis of procurement processes, supplier expectations and upcoming regulatory changes in Norway’s energy, infrastructure and transport sectors. It also offers actionable guidance for foreign small and medium‑sized enterprises (SMEs) aspiring to participate in Norway’s projects.

1. Regulatory architecture and procurement procedures

1.1 Public Procurement Act and EU/EEA alignment

The Public Procurement Act (Lov om offentlige anskaffelser) and its regulations implement the EU procurement directives in Norway via the EEA Agreement. This legislation applies to central government entities, municipalities, state enterprises (e.g., Statnett, Bane NOR, Avinor), health trusts and defence agencies. In July 2026 a significant amendment introduced security and preparedness as a cross‑cutting consideration in public procurement (new section 5d), raised the threshold triggering the Act from NOK 100,000 to NOK 500,000, and imposed a duty on contracting authorities to publish a procurement strategy. However, the amendments explicitly state that EEA non‑discrimination continues to apply; contracting authorities cannot favour Norwegian suppliers and must apply the same standards to all EEA companies. The revised Act emphasises transparency about ownership and supply‑chain resilience, expecting suppliers to meet security and preparedness requirements across the tender lifecycle.

Norway’s procurement thresholds operate at two levels: national thresholds trigger publication on Doffin and EEA thresholds trigger publication on both Doffin and TED. As of 2025 the national threshold for goods, services and construction works is NOK 1.4 million, while the EEA threshold for construction works is NOK 56 million. Contracts below the national threshold may still require competition, but public entities are not obliged to post notices on Doffin.

1.2 Doffin and TED – publishing and searching opportunities

Doffin (Database for offentlige innkjøp) is operated by the Norwegian Agency for Public and Financial Management. It is the mandatory portal for publishing procurement opportunities above the national threshold and serves as the single entry point for vendors. Doffin publishes contract notices, prior information notices (PINs), award notices, dynamic purchasing system notices and design contest notices. Because Norway is part of the EEA, above‑threshold notices also appear on the EU’s TED platform. Doffin is primarily in Norwegian, and suppliers often need to navigate using CPV codes (Common Procurement Vocabulary) and NUTS codes (regional codes). The most active contracting entities on Doffin include Statnett (grid operator), Nye Veier and Statens vegvesen (roads), Bane NOR (rail), Forsvarsmateriell (NDMA) (defence), health trusts, and Statsbygg (public buildings).

Procurement procedures. Norway mirrors EU procedures: the open procedure allows any qualified supplier to bid; the restricted procedure uses a pre‑qualification phase; competitive dialogue and negotiated procedures are for complex contracts; innovation partnerships support development of new solutions; and dynamic purchasing systems allow continuous supplier entry. Suppliers from EU/EEA states have full access to above‑threshold contracts; companies from countries that are parties to the WTO GPA (e.g., the U.S., Canada, Japan) also have access. The Public Procurement Act prohibits domestic preference, but the 2026 amendments require contracting authorities to integrate security and preparedness considerations into qualification criteria, award criteria and contract clauses.

2. Energy and utilities procurement

2.1 Statnett – transmission grid operator

Statnett, Norway’s transmission system operator (TSO), oversees the national high‑voltage grid and invests heavily in grid reinforcement, offshore connections and digitalisation. Statnett’s procurements follow the Public Procurement Act and the Regulation for the Utilities Sector. For contracts above the utilities sector threshold, Statnett uses Achilles Utilities NCE, a qualification system that pre‑screens suppliers and publishes qualification questionnaires. Suppliers must register in Achilles to receive invitations to Statnett’s tenders.

Supplier obligations – Ethical Guidelines. Statnett’s Ethical Guidelines for Suppliers (English version) form a binding part of contracts. Key requirements include:

  • Compliance with laws and internationally recognised standards: Suppliers must comply with Norwegian law when operating in Norway and abide by international standards such as the UN Guiding Principles on Business and Human Rights and OECD guidelines.
  • Supply‑chain due diligence: Suppliers must ensure that sub‑suppliers adhere to the same standards and must provide supply‑chain documentation and allow audits.
  • Human rights and decent working conditions: Suppliers must respect fundamental human rights, ensure written employment contracts, pay at least minimum wage and ensure a safe working environment. They must prohibit forced labour and child labour and promote equality.
  • Climate, nature and environment: Suppliers must comply with environmental laws, operate in line with international climate goals, implement continuous improvements to reduce greenhouse gases and environmental impact, follow the mitigation hierarchy (avoid, minimise, restore, compensate) and develop environmentally friendly solutions.
  • Business integrity: Suppliers must refrain from corruption, bribery, extortion and money laundering, avoid conflicts of interest, comply with competition laws and sanctions (including UN, EU and U.S. sanctions), and avoid offering gifts or hospitality during procurement processes.
  • Reporting and consequences: Breach of the guidelines constitutes contractual breach; Statnett may require remedial actions, suspend work, withhold payment, replace a sub‑supplier or terminate the contract. Severe breaches can lead to exclusion from Statnett’s procurement processes and may be influenced by international exclusion lists such as the Norwegian Sovereign Fund’s list or World Bank lists.

Contract terms for goods and services. Statnett’s general contract terms for goods require adherence to the Sale of Goods Act with modifications. Only written purchase orders are binding; contracts include the purchase order, Statnett’s specifications and drawings, enquiry, insurance certificate and the ethical guidelines. Prices are fixed and include taxes, customs, packing, transportation, insurance and unloading. Payment terms require E‑invoicing within 30 days; invoices not meeting reference requirements are rejected. Delivery follows Incoterms DDP; suppliers must ensure goods are fully insured until delivered and must follow Statnett’s packaging and labelling instructions. Statnett imposes liquidated damages for delay (0.15 % of contract sum per day, capped at 15 %). Suppliers must maintain a satisfactory quality and HSE system and allow Statnett to audit suppliers and sub‑suppliers.

Labour crime and subcontracting. Statnett’s 2019 Expectations to suppliers and contractors emphasises prevention of labour crime. Contractors must strengthen systems to combat unethical and illegal labour practices, limit the use of subcontractors, conduct scrupulous controls of sub‑suppliers, inform workers of their rights in their own language, establish anonymous whistle‑blowing systems and disclose documentation. They must notify Statnett of any suspicion of labour crime and act firmly when incidents occur. These expectations reflect Norway’s zero tolerance for wage theft and exploitation.

2.2 Other energy companies and utilities

Plug – shore power and maritime charging infrastructure

Plug AS develops shore power and maritime charging infrastructure along the Norwegian coast. Their purchasing principles emphasise cost, quality, safety and sustainability; all procurement is guided by equal treatment, transparency and traceability. Suppliers must demonstrate compliance with health, safety and environment (HSE) standards, quality management, financial stability and professional capability, and they must ensure similar standards in their supply chains. Plug’s Supplier Code of Conduct requires climate and environmental responsibility, decent working conditions, human rights, anti‑corruption, confidentiality, sanctions compliance and respect for laws. Plug encourages early dialogue with suppliers, uses digital pre‑qualification platforms and emphasises EHF invoicing (Electronic Trading Format) for billing. Suppliers are expected to support low‑emission maritime operations and demonstrate measurable environmental performance.

Avinor – airports operator

Avinor manages Norway’s civil airports and air navigation services. As a state enterprise, Avinor is subject to the Public Procurement Regulations and emphasises responsible purchasing as part of its sustainability work. It requires all suppliers to adhere to its ethical guidelines covering human rights, labour rights, environment and business ethics. Avinor sets high standards and uses market and supplier dialogue and contract follow‑up to influence suppliers. Procurement at Avinor also integrates climate and environmental considerations; the regulations now require that award criteria related to climate and environment must carry a minimum weighting of 30 %. Exceptions exist when including environmental requirements in technical specifications delivers a better outcome. Avinor emphasises early planning to purchase goods and services that last longer, generate less waste and have a smaller climate footprint.

  • Offshore wind and green transition: Norway is opening areas for offshore wind, hydrogen and carbon capture projects. Procurement frameworks emphasise innovation partnerships and early supplier involvement. Suppliers should expect requirements on local content, environment, supply‑chain integrity and long‑term maintenance.
  • Electrification of transport: Shore power, electric ferries and bus charging infrastructure are being rolled out. Entities like Plug and municipal port authorities look for suppliers that can deliver turnkey solutions while meeting strict HSE and climate requirements.
  • Digitalisation and cybersecurity: Grid and energy projects increasingly involve digital control systems, requiring suppliers to meet cybersecurity standards, data sovereignty rules and potential Security Act obligations (see section 5).

3. Roads and highways procurement

3.1 Norwegian Public Roads Administration (Statens vegvesen) and Nye Veier

Norway’s road construction is largely managed by Statens vegvesen (Norwegian Public Roads Administration) and Nye Veier AS, a state company created to build and operate major highways efficiently. Roads are the largest single category of public procurement; Norway’s geography demands massive investment in tunnels, bridges and road maintenance.

Procurement models. Traditionally, Statens vegvesen used design‑bid‑build contracts. However, with the creation of Nye Veier, Norway has adopted design‑build (DB) and public‑private partnership (PPP) models to improve cost efficiency and speed. The OECD’s Procurement strategy in major infrastructure projects evaluated two major road projects using the STEPS (Support Tool for Effective Procurement Strategy) model. The OECD observed that procurement strategies significantly influence market concentration, cost, delays and quality; choices about contract type, duration and risk allocation can implicitly regulate the supplier market. Nye Veier set a target of 20 % cost reduction and used DB contracts with early contractor involvement to reduce pre‑contract uncertainty. While the STEPS tool helps structure procurement decisions, the OECD noted that decisions still rely on subjective judgments and recommended more holistic tools to avoid suboptimal outcomes.

Tendering process. Road tenders above thresholds are published on Doffin and often open to international bidders. For large DB projects, a pre‑qualification phase selects a shortlist of consortia based on financial strength, technical capability, HSE record, and ability to partner with local subcontractors. Contracting authorities evaluate bids on price, quality, risk management, innovation, environmental performance and life‑cycle costs. Suppliers must demonstrate compliance with the Working Environment Act, HSE regulations, and wage conditions. Road contractors are required to use HSE cards for workers on construction sites and follow public procurement rules to combat labour crime.

Selection criteria and local partnerships. Under the Public Procurement Act, awarding authorities can include social and environmental criteria. Response time and local presence may indirectly favour suppliers with Norwegian partners or subsidiaries. The 2026 reform emphasises that contracting authorities can divide frameworks into regional lots and impose preparedness‑based response times. While these criteria are lawful, they require foreign bidders to plan for local partnerships, site‑visit readiness and supply‑chain resilience.

3.2 Edge cases and risk management

  • Geotechnical complexity: Norway’s mountainous terrain makes road and tunnel projects risky. Suppliers must invest in risk management and geotechnical expertise; failure to anticipate geological conditions can lead to cost overruns and penalties.
  • Environmental permits: Road projects often impact wildlife, reindeer grazing routes and protected habitats. Environmental constraints can delay tendering, and suppliers must demonstrate mitigation plans.
  • Climate adaptation: Many contracts incorporate climate resilience criteria (e.g., avalanche protection, drainage systems) and require suppliers to propose climate‑adaptive designs.

4. Rail procurement – Bane NOR

Bane NOR is the state‑owned company responsible for the national railway infrastructure. It manages track maintenance, new line construction (e.g., the InterCity project) and digital systems (ERTMS). While cookie consent prevents full access to Bane NOR’s supplier pages in this research environment, general industry practices and other official guidance illuminate its procurement model:

  • Subject to Public Procurement Act and utilities regulations: Bane NOR must follow LOA and the Regulation for the Utilities Sector. Procurement procedures include open and restricted competitions, negotiated procedures and innovation partnerships.
  • Supplier qualification: Bane NOR uses qualification systems and may require certification for railway safety (similar to Achilles but specific to rail). Safety and technical competence are paramount.
  • Human rights and Transparency Act: Bane NOR emphasises responsible supply chains and compliance with the Norwegian Transparency Act (Åpenhetsloven), requiring suppliers to conduct human rights due diligence. This aligns with guidelines on Bane NOR’s Human rights (Norwegian Transparency Act) page (content not accessible here due to cookies).
  • ERTMS and digital rail: Bane NOR invests in European Rail Traffic Management System (ERTMS) digital signalling and requires suppliers to follow technical standards and cybersecurity requirements. Projects may be tendered as design‑build or supply‑install contracts.
  • Local presence: Similar to roads, response time requirements for maintenance contracts often necessitate local or regional presence.

5. Ports and maritime infrastructure procurement

Norway’s long coastline and busy export economy require continual investment in ports, harbours and maritime energy infrastructure. Several public and semi‑public actors procure works and services:

  • Municipal and regional port authorities manage local harbours and issue tenders for quay upgrades, dredging, equipment, and digital systems. Projects above thresholds appear on Doffin.
  • Kystverket (Norwegian Coastal Administration) handles navigation infrastructure (lighthouses, fairways) and may use innovation partnerships for smart navigation aids.
  • Plug AS (see section 2.2) illustrates how port energy companies structure procurement: fairness, sustainability, HSE and integrity are emphasised. Suppliers must meet climate, human rights, anti‑corruption and confidentiality standards and use EHF invoicing. Prequalification may be required, and early dialogue is encouraged.

Foreign suppliers of port equipment, quay cranes, energy systems or digital solutions should expect rigorous HSE and sustainability requirements, documentation of financial stability and quality systems, and possibly the need to collaborate with local partners to meet response‑time commitments or deliver after‑sales services.

6. Defence and security‑related infrastructure procurement

6.1 Norwegian Defence Materiel Agency (NDMA)

The NDMA is the main body responsible for procurement for the Norwegian Armed Forces. Defence procurement covers armaments (ships, aircraft, weapons), communications and IT systems, infrastructure such as bases and training facilities, and services. The NDMA manages framework agreements for supplies and services lasting two to four years. Overall defence procurement value is about NOK 16 billion annually.

Regulatory framework. Defence procurements are subject to the Public Procurement Act (LOA), the Regulation on Public Procurement (FOA) and the Regulation on Defence and Security Procurement (FOSA). FOSA implements EU Directive 2009/81/EC and applies to purchases of specific defence and sensitive security equipment and works. Some contracts are exempt from FOA/FOSA, notably purchases of armaments or contracts involving classified information essential to national security. Tendering is competitive whenever possible; open tenders are published on Doffin, but tenders involving classified information may be conducted directly with appropriate suppliers.

Ethical conduct and integrity. NDMA emphasises ethical conduct: transparency, equal treatment of suppliers, documentation and verifiability of decisions. The agency also has anti‑corruption policies, whistle‑blowing mechanisms and industrial cooperation agreements (offsets) for certain procurements. Contracts may require suppliers to have security clearance and sign security agreements under the Security Act. For contracts dealing with classified information or assets, the Security Act requires beneficial‑ownership disclosure and may subject foreign-owned suppliers to a clearance process.

6.2 Security and preparedness amendments (2026)

Nordia Law’s 2026 note explains that from 1 July 2026, security and preparedness become statutory considerations across Norwegian public procurement. The new section 5d of the Procurement Act allows contracting authorities to impose security requirements at every stage; the threshold for the Act’s application is raised to NOK 500,000. The reform does not permit favouring Norwegian suppliers; the EEA non‑discrimination principle remains. Instead, authorities are expected to actively assess security and preparedness in each procurement and embed them into qualification requirements, specifications, award criteria and contract terms. Suppliers should anticipate more frequent requirements regarding ownership transparency, supply‑chain resilience, data security and local response capabilities.

Nordia highlights three lawful but demanding mechanisms: (1) dividing national frameworks into geographic lots – favouring suppliers with local presence; (2) imposing response‑time requirements justified by preparedness – requiring suppliers to deploy personnel on site within hours; and (3) calibrating security qualification requirements to the contract’s risk. These mechanisms do not discriminate explicitly but can challenge foreign suppliers. Suppliers must plan for local partnerships or subsidiaries, maintain documented security measures, and price the costs of compliance. Contracts that touch classified material may additionally trigger the Security Act, requiring supplier clearance and owner transparency. Under the Security Act, authorities can assess acquisitions of suppliers holding clearances and, if necessary, withdraw clearances or impose change‑of‑control clauses.

6.3 Future acquisitions – long-term defence spending

The Ministry of Defence regularly publishes a Future Acquisitions Plan (FAF) outlining planned defence investments over a 10‑year horizon. The plan aims to give industry early insight into upcoming projects so suppliers can prepare and develop necessary capabilities (information not directly quoted due to navigation issues). For defence‑adjacent infrastructure (e.g., military airfields, ports used by NATO), suppliers should monitor the FAF and Doffin. Projects may include runway extensions, fuel depots, training facilities and security upgrades. Industrial cooperation obligations or offsets may apply for large defence contracts, requiring foreign suppliers to invest a percentage of contract value in Norwegian industry.

7. Supplier requirements – cross‑sector themes

Across energy, infrastructure and transport sectors, several cross‑cutting requirements consistently appear in Norwegian procurement documents:

  1. Health, safety and environment (HSE): Suppliers must have robust HSE systems, provide regular training, and comply with Norwegian standards. Statnett’s contracts require a satisfactory HSE system and allow audits; Plug emphasises HSE compliance; road and rail projects require HSE cards for workers.

  2. Ethical conduct and labour rights: Norwegian buyers expect suppliers to respect human rights, labour rights and collective bargaining. Statnett’s guidelines demand freedom of association, written contracts, living wages and non‑discrimination. Avinor’s guidelines require respect for fundamental human rights.

  3. Supply‑chain due diligence: Suppliers must verify sub‑suppliers’ compliance and implement due diligence processes. Statnett emphasises supply‑chain documentation and audits; Plug expects suppliers to ensure similar standards throughout their supply chain.

  4. Climate and environmental performance: The trend is towards integrating climate criteria into procurement. Statnett asks suppliers to reduce greenhouse gases and follow mitigation hierarchies. Avinor must weight climate and environmental criteria at 30 % in award evaluations. Many tenders now require life‑cycle assessments, emissions reduction plans or environmental product declarations.

  5. Business integrity: Zero tolerance for corruption, bribery and money laundering appears across sectors. Statnett prohibits gifts, bribery and money laundering and requires compliance with sanctions. Plug expects zero tolerance for corruption. Avinor emphasises business ethics.

  6. Digital and cybersecurity requirements: As infrastructure becomes digitalised, suppliers must meet cybersecurity standards. Defence contracts may require security clearance and compliance with the Security Act. Rail projects using ERTMS require adherence to digital standards. The 2026 reform expects greater scrutiny of data security and ownership, particularly for cloud and AI suppliers.

  7. Documentation and transparency: Norwegian procurement emphasises documentation – from tax and social security certificates to beneficial ownership disclosure. Doffin submissions often require an European Single Procurement Document (ESPD) and may require Brønnøysund registration and electronic signatures. Statnett demands supply‑chain documentation and allows audits.

  8. Local presence and partnerships: Response‑time requirements and geographic lots can indirectly favour suppliers with local presence. Foreign SMEs may need to partner with Norwegian firms to meet these requirements. Early engagement with local subcontractors is often essential for roads, rail and defence projects.

8. Actionable steps for foreign SMEs entering Norway’s energy and infrastructure procurement markets

  1. Understand thresholds and registration: Determine whether your prospective contract is above the NOK 1.4 million national threshold (goods/services) or the NOK 56 million EEA threshold (construction). Above‑threshold contracts will appear on Doffin and, for EEA thresholds, on TED. Register your company on Doffin and create alerts by CPV and NUTS codes. For utilities sector tenders, register in the relevant qualification system (e.g., Achilles Utilities NCE for Statnett).

  2. Prepare documentation: Assemble an ESPD, tax certificates from your home country, social security proof and beneficial ownership information. Check whether you need to register with the Norwegian Brønnøysund Register Centre; this is often required for contract execution. Ensure you have an accepted electronic signature method (Norwegian BankID or EU eIDAS).

  3. Demonstrate HSE and quality systems: Develop an HSE management system that complies with Norwegian standards. Document your quality management and have it ready for audits. Ensure all employees working in Norway obtain HSE cards where required.

  4. Conduct supply‑chain due diligence: Map your supply chain and implement procedures to verify compliance with human rights, labour rights, and environmental standards. Prepare to share information on sub‑suppliers, ownership structures and risk mitigation measures.

  5. Integrate sustainability: Create an environmental plan for each tender, including greenhouse‑gas reduction strategies, energy efficiency, and life‑cycle analyses. Prepare to meet Norway’s minimum 30 % weighting on climate and environmental criteria.

  6. Strengthen business integrity: Adopt anti‑corruption and anti‑money‑laundering policies. Train staff on ethical conduct and ensure you have mechanisms to report and act on breaches. Avoid offering hospitality during tender processes and disclose any potential conflicts of interest.

  7. Address security and preparedness: Evaluate whether your products or services involve sensitive infrastructure, data or dual‑use technology. Develop a security and preparedness plan, including data security, cybersecurity, supply‑chain resilience and local response capabilities. Be ready to provide information about ownership structures and obtain security clearance if the project falls under the Security Act.

  8. Plan local partnerships: Anticipate response‑time requirements and geographic lots. Consider partnering with Norwegian firms for on‑site services, maintenance and logistics. Local partners can also help navigate cultural norms, language and regulatory nuances.

  9. Engage early and innovate: Many Norwegian entities encourage market dialogue and innovation partnerships. Use PINs on Doffin to identify upcoming projects and propose innovative solutions. For example, the design‑build approach used by Nye Veier invites early contractor involvement to reduce uncertainty.

  10. Monitor legal developments: Stay informed about changes in procurement law, such as the 2026 security and preparedness amendments, the evolving interpretation of the Security Act and FOSA, and new sustainability regulations. Consult local counsel for high‑value or defence‑adjacent projects.

9. Conclusion

Norway’s energy, infrastructure and transport procurement landscape is sophisticated, transparent and increasingly aligned with strategic objectives: decarbonisation, digitalisation, resilience and security. Public agencies such as Statnett, Nye Veier, Statens vegvesen, Bane NOR, Avinor, Plug and NDMA follow robust procurement rules derived from EU directives and the Public Procurement Act. Recent reforms embed security considerations and raise thresholds, while sustainability requirements are strengthened. Suppliers must navigate strict ethical and environmental standards, rigorous documentation, and often complex contract structures. However, Norway’s openness to foreign suppliers through the EEA Agreement and GPA, combined with predictable procedures and published long‑term plans, creates opportunities for SMEs that prepare diligently.

By understanding the regulatory environment, pre‑qualifying on relevant portals, aligning with Norway’s values on sustainability and integrity, and forming local partnerships, foreign suppliers can effectively enter Norway’s thriving markets for utilities, roads, ports, rail, offshore projects, grids and defence‑adjacent infrastructure.

References

  1. Statnett procurement practices – Statnett conducts procurement according to the Public Procurement Act and the Utilities Sector Regulation and uses the Achilles Utilities NCE qualification system. Their ethical guidelines require compliance with laws, supply‑chain due diligence, respect for human rights, environmental protection, anti‑corruption, and allow for audits and sanctions. Their contract terms demand E‑invoicing, Incoterms DDP delivery, HSE systems, and quality audits. Statnett expects suppliers to prevent labour crime and conduct strict controls of sub‑suppliers.

  2. Doffin procurement portal – Doffin is Norway’s national database for public procurement; all above‑threshold opportunities must be published there. Norway’s procurement market is about NOK 650 billion annually. Thresholds for goods and services are NOK 1.4 million nationally and NOK 2.05 million at the EEA level; for construction the threshold is NOK 56 million. Procurement procedures mirror EU directives: open, restricted, competitive dialogue, negotiated, innovation partnerships and dynamic purchasing systems. Environmental criteria must be weighted at least 30 % in many contracts.

  3. Nordia Law on 2026 procurement reforms – From 1 July 2026 security and preparedness become cross‑cutting considerations under a new section 5d of the Procurement Act; the threshold rises to NOK 500,000; and authorities must publish procurement strategies. EEA non‑discrimination remains, meaning foreign suppliers cannot be excluded based on nationality. Contracting authorities will impose security and supply‑chain requirements across qualification, award and contract stages. Neutral mechanisms such as geographic lots and response‑time requirements may indirectly favour local suppliers, so foreign SMEs should plan partnerships. Classified contracts are governed by the Security Act and may require supplier clearance and ownership transparency.

  4. NDMA procurement – The Norwegian Defence Materiel Agency handles defence procurement worth about NOK 16 billion annually; it follows the Public Procurement Act, FOA and FOSA, but some armaments and classified contracts are exempt. Competitive tenders are published on Doffin when possible, but classified tenders are handled directly. NDMA emphasises transparency, equal treatment and ethical conduct.

  5. Plug port procurement – Plug requires suppliers to meet HSE, quality, financial and professional standards, adhere to a Supplier Code of Conduct covering climate responsibility, human rights, and anti‑corruption, and use EHF invoicing. Early supplier dialogue and digital pre‑qualification are encouraged.

  6. Avinor responsible purchasing – Avinor considers responsible purchasing part of its sustainability strategy; suppliers must adhere to ethical guidelines covering human rights, labour rights, environment and business ethics. Award criteria related to climate and environment must carry a minimum 30 % weight; these requirements influence procurement across Avinor’s 150–200 yearly procurements.

  7. OECD analysis of road procurement – Procurement strategy choices influence market structure, cost and project success. Nye Veier used design–build contracts and early contractor involvement to target a 20 % cost reduction; the OECD’s STEPS tool supports evidence‑based procurement but decisions still rely heavily on subjective judgment.

+END OF FULL REPORTDownload original Markdown